CF Industries delivered a robust 2025 with 2025 adjusted EBITDA near $2.9B, but faced a material Yazoo City outage that will depress 2026 output and EBITDA, while advancing Blue Point and low-carbon initiatives amid a tight, constructive nitrogen market.

Key Highlights

Strong 2025 Core Performance
Adjusted EBITDA for 2025 was about $2.9 billion, driven by operational excellence and favorable nitrogen market dynamics.
Yazoo City outage impact
Yazoo City complex remains down with production not expected to resume until late 2026; 2026 gross ammonia guidance reduced to ~9.5 million tons due to this outage.
Blue Point progress and timing
Blue Point project with JERA/Mitsui advanced with milestones; civil work planned to begin in Q2 2026, with total project cost around $3.7 billion and potential scalable future expansions.
Free cash flow and capital allocation
2025 net cash from operations of $2.75 billion and free cash flow of ~$1.8 billion; $1.7 billion returned to shareholders in 2025 via share repurchases; ongoing $2.0 billion authorized program with ~$1.7 billion remaining.
Market dynamics and carbon initiatives
Global nitrogen market remains constructive with strong North American demand, premiums for low-carbon ammonia, and progress on decarbonization (Donaldsonville CCS) and low-carbon product opportunities, including a POET collaboration.

Positive Signals

  • 2025 adjusted EBITDA of ~$2.9B reflects strong operational performance.
  • Significant free cash flow generation and robust shareholder returns ($1.7B in 2025).
  • Blue Point project progress with confirmed milestones and favorable economics.
  • Growing demand for low-carbon ammonia and carbon-related opportunities (premium pricing).
  • Insurance recovery expected for Yazoo City business interruption in 2026.

Negative Signals

  • Yazoo City complex outage; production not expected to resume until late 2026, lowering 2026 capacity guidance.
  • Impairment charges in Q4 2025 totaling $76M (including $51M for the Donaldsonville electrolyzer pilot).
  • Near-term EBITDA impact from Yazoo City offset by insurance proceeds yet to be realized throughout 2026.
  • Capital intensity and timing risk around Blue Point with large upfront spend and contingency exposure.
  • Uncertain CBAM/European carbon policy dynamics and potential pricing volatility.

📊Financial Results

  • Full-year 2025 net earnings attributable to common stockholders: ~$1.5B (~$8.97 per diluted share).
  • Full-year 2025 EBITDA: ~$2.8B; Adjusted EBITDA: ~$2.9B.
  • Q4 2025 EBITDA: ~$731M; Adjusted EBITDA: ~$821M; Impairments in Q4 2025: $76M total.
  • 2025 net cash from operations: $2.75B; Free cash flow: ~$1.8B.
  • Share repurchases: $1.7B returned in 2025; 2025 program completed; remaining authorization ~$1.7B through 2029.

🔮Future Guidance

  • 2026 expected capex: ~$1.3B consolidated; CF portion ~$950M (including $550M sustaining CapEx and ~$400M related to Blue Point/common infra).
  • Yazoo City: EBITDA impact of not running the complex in 2026 expected around $200M; BI insurance proceeds expected in 2026 to offset losses.
  • 2026 ammonia production guidance: ~9.5M tons (down from 10.1M in 2025) due to Yazoo outage.
  • Donaldsonville CCS project to yield higher CO2 sequestering (~1.5M tons in 2026) and potential 45Q credits; upside beyond existing modeling assumed in premium pricing.
  • Blue Point: no changes to total project cost guidance of ~$3.7B; cash-outflow profile updated to reflect timing without altering long-term returns; potential for additional expansion if market tightness persists.

💡Interesting Insights

  • The 5-plant site capacity at Blue Point suggests substantial optionality for future expansion beyond the initial 1.5 Mt site, depending on market dynamics and permitting.

Detailed Analysis

AI-generated summary of CF INDS HLDGS INC earnings call transcript.

CF Industries posted a strong 2025, with adjusted EBITDA of about $2.9 billion and net earnings of roughly $1.5 billion for the year, underpinned by excellent operations and high plant utilization (9.7% for ammonia in 2025) and substantial free cash flow generation (~$1.8 billion). The Yazoo City complex in Mississippi remains temporarily offline, delaying production until late 2026 and reducing 2026 gross ammonia guidance to ~9.5 million tons. The Blue Point JV progress remains solid, with civil work planned to start in 2Q2026 and a total project cost of about $3.7 billion; management notes potential for future expansions leveraging shared infrastructure. Cash flow was strong, with $2.75 billion of net operating cash flow and significant shareholder returns ($1.7 billion in 2025) against an ongoing capital allocation framework. The company remains bullish on continued nitrogen market tightness, rising demand, and premium opportunities from low-carbon products, including ongoing collaboration with POET. Insurance recoveries from Yazoo and ongoing 45Q-related benefits are expected to support 2026 earnings, though the Yazoo outage provides a near-term headwind that will weigh on EBITDA adoption in the near term.

Get Real-Time Earnings Call Alerts for CF INDS HLDGS INC

Create a free MarketAlerts account to add CF to your watchlist and receive instant AI-powered alerts when new earnings call transcripts, insider trades, and technical signals are detected.

Other MarketAlerts Features